CONSTRUCTION | ENGINEERINGStructural Utility Service RacksMercuryROSS Engineering were successfully awarded the installation of 580t of structural steel utility racks. The racks were all constructed at ground level in 50m x 6m...
ARCHIVES
Power Hub Utility Steel
ENGINEERINGÂ Power Hub Utility SteelDesigner GroupRoss Engineering were successfully awarded the "PowerHub Support Infrastructure" on a STACK data centre project in Norway. The project entails the design, fabrication, and...
Frame and Lid for Penetrations
ENGINEERINGFrame and Lid for PenetrationsConfidentialROSS Polymer were contracted to design and manufacture 3 alternative size penetration frames with lids. The frames and lids are rectangular in shape, made from polymer based...
Height Adjustable Circular Former
POLYMERHeight Adjustable Circular FormerExyteROSS Polymer were contracted to design and manufacture a height adjustable circular former that could be used in floors and walls for use in specialised construction facilities that...
Utility Level Lateral Service Supports
CONSTRUCTION | ENGINEERINGUtility Level Lateral Service SupportsMercuryThe project consisted of the fabrication, assembly, and installation of Unistrut racks for the purpose of holding and supporting mechanical and process...
Commercial and Industrial Stair
ENGINEERINGCommercial and Industrial StairExyteThis project involved detailing, fabricating and install of 40 individual stairs in a state-of-the-art semiconductor facility situated within the Leixlip Campus in Kildare. The...
Installation and alignment of Class 10 Cleanroom Crain Rail
ENGINEERINGInstallation and alignment of Class 10 Cleanroom Crain RailExyteROSS Engineering was entrusted with fabricating and installing a 50m long Class 10 cleanroom crane rail. This task showcased the complexity involved,...
Wycliffe Park Retirement Village
CONSTRUCTIONWycliffe Park Retirement VillageGrahamROSS Construction is proud to announce its appointment as the primary contractor for Grahame for the construction of the external envlope of the Wycliffe Park Retirement Village,...
Structural Raised Access Cleanroom Floor
ENGINEERINGStructural Raised Access Cleanroom FloorconfidentialROSS Engineering were awarded the construction of a permanent raised metal structural cleanroom modular floor, covering and area of mover than 2,273m2. Each floor...
Waffle Deck
SERVICE TYPE ONE | SERVICE TWOWaffle DeckExyte Project delivered ahead of schedule 219,002 Incident free hours recorded 166,400 Displaced site-based hours ROSS Engineering were contracted to Detail, manufacture supply and...